This is an approximately 16,000 SF (three-story Hotel + single-story storage) building, along with required parking, driveway, and sidewalk. A portion of the front of the property will be left vacant for a future luxury restaurant. Two (2) interconnected dry detention ponds will be constructed along the west property line to meet water quality and quantity requirements.
This project proposes constructing approximately 18,000 SF (two -story) office building with the required pavement for sidewalks, parking, and driveways. A dry detention pond with a control structure will be provided under the north rear of the building to meet the Water Management District and other agencies' water quality and quantity requirements.
This project proposes constructing approximately 13,850 SF of a three-story hotel and 4,200 SF of restaurant buildings, along with the required pavement for sidewalks, parking, and driveways. Three (3) interconnected dry detention ponds with a control structure will be provided to meet the Water Management District and other applicable government agencies' water quality and quantity requirements.